Conceived and developed by an independent specialist, PETROCADDDESIGNS establishes itself in the realm of Piping Design within the Oil & Gas industry. Its technical development is congruent with the technologies inherent to the industrial metaverse.

While its default proposal is in its formative stage and its business model under definition, PETROCADDESIGNS' offering of technical services inherently transcends the status quo.

PFD -  ATTRIBUTION US4031404 PATENT BY MARKUS HORMAZA
SHELL-AND-TUBE HEAT EXCHANGER (AES TYPE) BY MARKUS HORMAZA.gif

 

EQUIPMENT

[CLICK HERE]

CRUDE OIL REFINING STATION PLOT PLAN BY MARKUS HORMAZA

 

PIPING DESIGN

[CLICK HERE]

PIPING DESIGN - ILLUSTRATIVE ISOMETRIC BY MARKUS HORMAZA

PROCESS FLOW DIAGRAM

ATTRIBUTION US4031404 PATENT

 

SHELL-AND-TUBE HEAT EXCHANGER (AES TYPE)

3D MODEL

CRUDE OIL REFINING STATION - PLOT PLAN

PIPING DESIGN

ILLUSTRATIVE ISOMETRIC

​​

​​​KNOW HOW

​​​​

COMPETITIVE ADVANTAGE:


- Parametrized Diagramming
- Digital Modeling
- Scenarios, Simulation, and Testing
- Augmented Reality and Virtual Reality
- Artificial Intelligence and Data Analytics

PETROCADDDESIGNS' IMPLEMENTS:


- Industrial Standardization
- Industry 4.0
- BIM Implementation

- As-Built Documentation

- Additive Prototyping

 

​​

​​​OWN WORK

​​​​

PETROLEUM EXTRACTION AND TRANSPORTATION INFRASTRUCTURE

TECHNICAL DATASHEET
 

| | Project Name: PETROLEUM EXTRACTION AND TRANSPORTATION INFRASTRUCTURE | | Skills:​ Technical draft, Piping Design and Reverse engineering | | Management by: Markus Hormaza | | Software Used: Autodesk, Inc | | Place and Date: Colombia, Bogota DC, July 2024 | | General Description: This 3D model, developed at LOD 200. It showcases engineering efforts in optimizing crude oil logistics and enhancing operational efficiency within petrochemical infrastructure hubs | | Importance of the 3D Model Concept: Optimization of Planning - Improvement of Coordination - Facilitation of Processes - Identification and Layout of Equipment and Piping | | Technical Design Components: Geometric Detailing - System Integration - Norms and Standards | | Required Expertise: Reservoir Engineering - Process Engineering - CAD Modeling | | Contact: Markus Hormaza, hormazamarkus@gmail.com | | Copyrights: ASAP PROJECTS © Rights reserved | |

 

​​

​​​OWN WORK

 

WELDED TANK OIL STORAGE

WELDED TANK OIL STORAGE Accordance with API 650 Standard, 13rd Ed. by Markus Hormaza
INMERSIVE 3D MODEL

TECHNICAL DATA SHEET

| | Project Name: WELDED TANK OIL STORAGE – API 650 standard, 13th Ed. | | Skills: Mechanical Equipment Design, Storage Tank Engineering, Piping & Plot Plan Layout, 3D Modeling & Technical Drafting | | Management by: Markus Hormaza | | Software Used: Autodesk, Inc. | | Place and Date: Colombia, Bogota D.C., July 2024 | | General Description: This 3D model, developed at LOD 350, ensures compliance with API 650 standard (13th Ed.) for the engineering, projection, and implantation of welded steel storage tanks within an industrial Plot Plan. The project encompasses mechanical equipment selection, foundation planning, and interconnection with process piping systems, optimizing the operational efficiency of crude oil storage and distribution facilities | | Importance of the 3D Model Concept: Welded Tank Projection & Mechanical Equipment Integration – Defines storage capacities, dimensions, and operational parameters -  Optimization of Plot Plan Layout – Ensures efficient spatial distribution of tanks, auxiliary equipment, and piping corridors - Improvement of Coordination – Facilitates multi-disciplinary collaboration in civil, mechanical, and process engineering - Facilitation of Process Interconnection – Enhances piping and manifold system routing for optimal fluid transport | | Technical Design Components: Geometric & Structural Detailing – Tank shell, roof, bottom plate, scaffold, nozzles, and supports - Mechanical Equipment Selection – Includes pumps, valves, heat exchangers, and instrumentation - Plot Plan Development – Integration of tank farms, access routes, pipe racks, and safety zones - Piping System Interconnection – Adheres to ASME B31.3 for Process Piping, ensuring optimal flow and safety - Norms and Standards Compliance – API 650 (Storage Tanks), API 620 (Low-Pressure Tanks), ASME B31.3 (Process Piping), NFPA 30 (Fire Protection Systems) | | Required Expertise: Welded Tank Design & Fabrication - Mechanical Equipment & Process Integration - Industrial Plot Plan Development - Advanced CAD-BIM Modeling for Oil & Gas Facilities | | Contact: Markus Hormaza
hormazamarkus@gmail.com | | Copyrights: ASAP PROJECTS © Rights Reserved | | 

 

SCOPE

Piping Design - Tanks and Equipment Implantation - AsBuilt documentation

 

LEADERSHIP

Under the leadership of Markus Hormaza, PETROCADDESIGNS continues to explore and develop innovations within the industrial metaverse, blending the physical and digital worlds to create a more efficient and sustainable manufacturing environment in the Oil & Gas industry.​

(c) PETROCADDESIGNS

Techniques and Design for Oil & Gas Projects

[A Spin-Off by ASAP PROJECTS]

MARKUS HORMAZA

Piping Designer / CAD Manager

hormazamarkus@gmail.com

Since 2023

© Made in Colombia

bottom of page